Sign In | Join Free | My insurersguide.com
China Jiangsu Acemien Machinery Co., Ltd. logo
Jiangsu Acemien Machinery Co., Ltd.
Jiangsu Acemien Machinery Co., Ltd. Focus on quality, sincerity service, sincere cooperation, mutual development
Active Member

7 Years

Home > PP Hollow Sheet Extrusion Line >

PP Hollow Formwork Extrusion Machine

Jiangsu Acemien Machinery Co., Ltd.
Contact Now

PP Hollow Formwork Extrusion Machine

Brand Name : ACEMIEN

Model Number : ACMH01

Certification : CE,ISO

Place of Origin : P.R.China

MOQ : 1 set

Payment Terms : L/C, T/T

Supply Ability : 10 sets per month

Delivery Time : 90 days

Packaging Details : Wood case and film wrapped

Extruder Model : Single screw

NO. of Extruder : 2 extruders

Application : Concrete Slab,Column,Beam,Wall forming

Die mould : Reliable Zhejiang Famous

Workshop Line Dimension : 30mx6mx4m

Running Votage : 380V 50HZ or customized

Product Thickness : 15-17mm

Line Speed : 5m/min max

Water chiller : 35HP required

Calibration Station : 3 stages with recycling cool water and vacuum system

Haul off : 2 stages(6 groups of roller foreward, 2 groups afterward)

Cooling bracket6 rolls forward and 2 afterward : Forward and afterward each

Sheet Cutter : Saw blade cutter with programmable length control

Production Capaaciry : Max 400PCS

Installation Power : 420KW Max

Feeding Mode : Vacuum loader

Contact Now

Economic Recyclable PP Hollow Concrete Formwork Extrusion Machine

PP concrete formwork trendency
Nowadays in 21st century, a successful industry relies more and more on the feasibility of sustainable solution, which means lower in cost and
friendly to environment. Among many of the current formworks, PP hollow construction formwork draws much more attention among the construction
engineers and related users and busniness man due to the low cost and environment contribution.

Although in some places, project team get used to the traditional formwork such as formworks of wood, bamboo, aluminum, and PVC sheet, the market for formwork is undergoing great innovation by replacement of a new formwork call PP Hollow Construction Formwork of high strength,light weight, short project time and lower price which greatly satisfied the businessman, meantime, in considering that the contruction consumes plenty of timber resoucres which are not recyclable, the government advocates more to use pp formwork in construction biulding.

At the same time, the project team also find it easy and happy to use this new formwork, beacause it is easy to maintain and handle in practise, for the same project they do the less work.

For the reason above, the new formworks are in great demand, so here comes the great chance to produce and sell this new formwork, we have the formular, and we have the mechanic engineers and production experiences, in machines and production we are experts.


PP formwork sheet production flowchart






Production line machine list and engeering drawing


PP construction formwork sheet advantage
1,Due to its smooth surface, it is easy to demould even after 20 or 30 times more without release agent.
2,Easy to handle and transport due to light weight which is between 7 and 11 kg/m2.
3,It has a stable performance in weather exposure, it can work without deformation and swelling between -20℃ and +60℃, and is also resistant to acid ,alkali and water.
4,Easy to maintain and clean, after demoulding, highpressure water can be used for surface cleaning.
5,Reuse is applicable to reduce the cost in construction formwork, for example the formwork for concrete wall and slab can be reused for 30 times more,
and the formwork for concrete beam,pillar and colum can be reused for 40 times more.
6,It makes construction project time shorter and less consumption for formwork, for example, for a 35-floor building, we only need to prepare formwork for 3 or 4 floors' scale.
7,Finally, the waste or damaged sheet can be crushed into flakes to feed the production of pp formwork again.

PP Hollow Construction formwork comparing to others

Item compared PP hollow formwork sheet PVC sandwich formwork sheet Wood formwork sheet Aluminum formwork sheet Bamboo plywood sheet
Unit Price CNY/m2 60 75 35 800 39
Recycling times 50-100 20-30 4-6 80-100 8-10
10m Fall off test No deformation No deformation Cracked Deformed Slightly cracked
Anti-abrasion Yes Yes No Yes No
Shape after water absorption Remain same Remain same Transformed Remain same Transformed
Demould Easy Easy Hard Hard Hard
Nail stapling Easy Hard Easy Can not Easy
Swelling and shrinkage Slightly Depending on temperature Slightly Slightly Slightly
Eco-friendly Recyclable Recyclable Nearly non-recyclable,consumption more timber resources Recyclable Nearly non-recyclable,consumption more timber resources
Weight kg/m2 7 13 7.2 25 6.5
Project time Short Longer Short Long Short
Wasted Price 30 18 1 200 3
Cost in average 1.2 2.8 5.6 6.0 3.2


After-Sales Policy
1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.


Product Tags:

PP Hollow Formwork Extrusion Machine

      

17mm PP Extrusion Machine

      

420KW PP Extrusion Machine

      
Cheap PP Hollow Formwork Extrusion Machine for sale

PP Hollow Formwork Extrusion Machine Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangsu Acemien Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)